Facts 

Name:INTERSTATE 5 NB over FREEPORT BL,ABANDONED RR
Structure number:24 0296R
Location:03-SAC-005-15.59-SAC
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:121.1 ft. [36.9 m]
Total length:554.2 ft. [168.9 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Vertical clearance below bridge:26.6 ft. [8.1 m]
Skew angle:49°
Owner:State Highway Agency [01]
Year built:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: July 2014 

Status:Open, no restriction [A]
Average daily traffic:46,500 [as of 2010]
Truck traffic:18% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Better than present minimum criteria [7]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Superior to present desirable criteria [9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:80.2 tons [72.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$4,668,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
July 201480.0Structurally deficientPoorVery GoodVery Good46500
June 201278.0Structurally deficientPoorGoodGood46500
December 201079.0Structurally deficientPoorGoodGood42500
June 200882.0Not deficientGoodGoodGood42500
September 200682.0Not deficientGoodGoodGood42500
March 200383.0Not deficientGoodGoodGood27900
February 200183.0Not deficientGoodGoodGood27900
March 199978.0Structurally deficientSeriousGoodGood27900
March 199778.0Structurally deficientSeriousGoodGood27900
April 199583.0Not deficientSatisfactoryGoodGood25150
September 199383.0Not deficientSatisfactoryGoodGood21200
July 199183.0Not deficientSatisfactoryGoodGood21200