Share:

BROOKFIELD DR over FLORIN CREEK

Map 

Coordinates:
+38.48194, -121.44889
38°28'55" N, 121°26'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BROOKFIELD DR over FLORIN CREEK
Structure number:24C0291
Location:0.2 MI E FRANKLIN BL
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:19.0 ft. [5.8 m]
Total length:48.9 ft. [14.9 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:51.8 ft. [15.8 m]
Skew angle:13°
Owner:City or Municipal Highway Agency [04]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 2006]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:23.9 tons [21.7 metric tons]
Sufficiency rating:84.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:38.9 tons [35.4 metric tons]
Inventory rating:22.9 tons [20.8 metric tons]
Sufficiency rating:82.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1978]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:38.6 tons [35.1 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Sufficiency rating:81.8