Share:

EL CAMINO AVE over UP,BNSF,AMTRAK,SCRTD LRT

Map 

Coordinates:
+38.61083, -121.43500
38°36'39" N, 121°26'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:EL CAMINO AVE over UP,BNSF,AMTRAK,SCRTD LRT
Structure number:24C0359
Location:0.4 MI W. OF RTE. 51
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:117.1 ft. [35.7 m]
Total length:567.9 ft. [173.1 m]
Roadway width between curbs:62.0 ft. [18.9 m]
Deck width edge-to-edge:74.2 ft. [22.6 m]
Vertical clearance below bridge:21.0 ft. [6.4 m]
Skew angle:40°
Owner:City or Municipal Highway Agency [04]
Year built:1984
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:6
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,300 [as of 1977]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:89.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,300 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:95.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,300 [as of 1977]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.3