ON I STREET over I STREET VIADUCT

Map 

Coordinates:
+38.58583, -121.50500
38°35'09" N, 121°30'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ON I STREET over I STREET VIADUCT
Structure number:24C0364L
Location:BTWN I-5 & SACRAMENTO RIV
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:73.2 ft. [22.3 m]
Total length:630.0 ft. [192.0 m]
Roadway width between curbs:33.1 ft. [10.1 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Vertical clearance below bridge:26.9 ft. [8.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1936
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:15
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,200 [as of 1983]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:20.9 tons [19.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:63.1
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$4,522,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:33.9 tons [30.8 metric tons]
Inventory rating:20.9 tons [19.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:64.7
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$2,016,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1983]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,956,000