Share:

E&W80-E580 CONNCTR over UP RR,BNSF RY,AMTRAK,ETC

Map 

Coordinates:
+37.82694, -122.29167
37°49'37" N, 122°17'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E&W80-E580 CONNCTR over UP RR,BNSF RY,AMTRAK,ETC
Structure number:33 0061L
Location:04-ALA-580-46.09-OAK
Purpose:Carries highway overpass (third level) over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:122.1 ft. [37.2 m]
Total length:3996.3 ft. [1218.0 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:44.9 ft. [13.7 m]
Vertical clearance above deck:14.8 ft. [4.5 m]
Vertical clearance below bridge:17.7 ft. [5.4 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1955
Year reconstructed:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:55
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100,000 [as of 2000]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.8 tons [55.3 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.1
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$43,760,000

2000 Inspection 

Average daily traffic:128,800 [as of 1997]
Truck traffic:8% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:125,000 [as of 1990]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$12,136,000