INTERSTATE 580 over LAKESHORE BL & GRAND AVE
Map
Coordinates:
+37.81000, -122.2466737°48'36" N, 122°14'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | INTERSTATE 580 over LAKESHORE BL & GRAND AVE |
| Structure number: | 33 0131 |
| Location: | 04-ALA-580-43.48-OAK |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 122.1 ft. [37.2 m] |
| Total length: | 838.0 ft. [255.4 m] |
| Roadway width between curbs: | 136.2 ft. [41.5 m] |
| Deck width edge-to-edge: | 140.8 ft. [42.9 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 7 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 205,000 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.9 tons [63.5 metric tons] |
| Inventory rating: | 42.9 tons [39.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $18,555,000 |
2000 Inspection
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 207,100 [as of 1990] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.3 tons [63.0 metric tons] |
| Inventory rating: | 42.6 tons [38.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 80.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $7,957,000 |