Share:

23RD AVENUE over INTERSTATE 880

Map 

Coordinates:
+37.77667, -122.23500
37°46'36" N, 122°14'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:23RD AVENUE over INTERSTATE 880
Structure number:33 0139
Location:04-ALA-880-28.93-OAK
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:109.9 ft. [33.5 m]
Total length:503.0 ft. [153.3 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:54°
Owner:State Highway Agency [01]
Year built:1947
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,800 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.5 tons [63.2 metric tons]
Inventory rating:40.3 tons [36.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,528,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,800 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,704,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,800 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,092,000