HIGH ST-N880 ON RP over SR 77 & S880-N77 CONNCTR

Map 

Coordinates:
+37.77000, -122.22000
37°46'12" N, 122°13'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HIGH ST-N880 ON RP over SR 77 & S880-N77 CONNCTR
Structure number:33 0146S
Location:04-ALA-880-27.7-OAK
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:73.2 ft. [22.3 m]
Total length:170.9 ft. [52.1 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,500 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:89.0
Recommended work:Other structural work, including hydraulic replacements. [38]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,500 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$741,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,500 [as of 1980]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$297,000