W580 ON-RAMP over ROUTE 580
Map
Coordinates:
+37.81833, -122.2516737°49'06" N, 122°15'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | W580 ON-RAMP over ROUTE 580 |
| Structure number: | 33 0288 |
| Location: | 04-ALA-580-44.28-OAK |
| Purpose: | Carries highway overpass (third level) over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 121.1 ft. [36.9 m] |
| Total length: | 430.1 ft. [131.1 m] |
| Roadway width between curbs: | 135.8 ft. [41.4 m] |
| Deck width edge-to-edge: | 140.4 ft. [42.8 m] |
| Vertical clearance above deck: | 14.1 ft. [4.3 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 15° |
| Owner: | State Highway Agency [01] |
| Year built: | 1961 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 205,000 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.8 tons [78.0 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $9,441,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 192,500 [as of 1997] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Imminent Failure [1 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.8 tons [78.0 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 70.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $6,749,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 207,100 [as of 1990] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.1 tons [77.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,083,000 |