Share:

INTERSTATE 580 over ST RTE 24-I 980

Map 

Coordinates:
+37.82417, -122.26806
37°49'27" N, 122°16'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:INTERSTATE 580 over ST RTE 24-I 980
Structure number:33 0298
Location:04-ALA-580-45.15-OAK
Purpose:Carries highway overpass over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:99.1 ft. [30.2 m]
Total length:288.1 ft. [87.8 m]
Roadway width between curbs:122.1 ft. [37.2 m]
Deck width edge-to-edge:127.0 ft. [38.7 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1969
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:205,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.8 tons [71.6 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$6,961,000

2000 Inspection 

Average daily traffic:125,300 [as of 1997]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:250,000 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.2 tons [71.1 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,470,000