Share:

STATE ROUTE 24 over STATE ROUTE 13

Map 

Coordinates:
+37.84861, -122.22833
37°50'55" N, 122°13'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:STATE ROUTE 24 over STATE ROUTE 13
Structure number:33 0378
Location:04-ALA-024-R5.08-OAK
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:140.1 ft. [42.7 m]
Total length:286.4 ft. [87.3 m]
Roadway width between curbs:131.6 ft. [40.1 m]
Deck width edge-to-edge:136.2 ft. [41.5 m]
Vertical clearance below bridge:17.7 ft. [5.4 m]
Skew angle:55°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:119,000 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:77.5
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:119,000 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.5
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$2,714,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:111,300 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,625,000