Share:

E24-CLAREMONT OFF over TELEGRAPH AVE

Map 

Coordinates:
+37.84056, -122.26167
37°50'26" N, 122°15'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E24-CLAREMONT OFF over TELEGRAPH AVE
Structure number:33 0413S
Location:04-ALA-024-R3.06-OAK
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:119.1 ft. [36.3 m]
Total length:237.9 ft. [72.5 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,400 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.9 tons [69.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$890,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,400 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.8 tons [68.9 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,031,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,400 [as of 1983]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$417,000