Share:

W PORTAL BLDG BRDG over STATE ROUTE 24 WB

Map 

Coordinates:
+37.85472, -122.21806
37°51'17" N, 122°13'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:W PORTAL BLDG BRDG over STATE ROUTE 24 WB
Structure number:33 0522L
Location:04-ALA-024-R5.89-OAK
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:36.1 ft. [11.0 m]
Total length:37.1 ft. [11.3 m]
Roadway width between curbs:14.1 ft. [4.3 m]
Deck width edge-to-edge:21.3 ft. [6.5 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25 [as of 1998]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.8 tons [69.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$122,000

2000 Inspection 

Status:Open, no restriction [A]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.8 tons [69.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$132,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.2 tons [69.3 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$52,000