W PORTAL BLDG BRDG over STATE ROUTE 24 WB
Map
Coordinates:
+37.85472, -122.2180637°51'17" N, 122°13'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | W PORTAL BLDG BRDG over STATE ROUTE 24 WB |
| Structure number: | 33 0522L |
| Location: | 04-ALA-024-R5.89-OAK |
| Purpose: | Carries highway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 36.1 ft. [11.0 m] |
| Total length: | 37.1 ft. [11.3 m] |
| Roadway width between curbs: | 14.1 ft. [4.3 m] |
| Deck width edge-to-edge: | 21.3 ft. [6.5 m] |
| Vertical clearance below bridge: | 18.0 ft. [5.5 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25 [as of 1998] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 76.8 tons [69.8 metric tons] |
| Inventory rating: | 45.9 tons [41.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $122,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 76.8 tons [69.8 metric tons] |
| Inventory rating: | 45.9 tons [41.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $132,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 76.2 tons [69.3 metric tons] |
| Inventory rating: | 45.5 tons [41.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $52,000 |