Share:

SB US HIGHWAY 101 over COYOTE ROAD

Map 

Coordinates:
+37.27667, -121.80500
37°16'36" N, 121°48'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SB US HIGHWAY 101 over COYOTE ROAD
Structure number:37 0108L
Location:04-SCL-101-29.72-SJS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:51.8 ft. [15.8 m]
Total length:131.9 ft. [40.2 m]
Roadway width between curbs:68.2 ft. [20.8 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:45°
Owner:State Highway Agency [01]
Year built:1947
Year reconstructed:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:69,500 [as of 1999]
Truck traffic:9% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.5 tons [54.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:83.9
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:59,350 [as of 1997]
Truck traffic:9% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:78.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$665,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:69,950 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.0