Share:

US HIGHWAY 101 over NORTH 1ST STR & VTA LRT

Map 

Coordinates:
+37.37333, -121.91500
37°22'24" N, 121°54'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US HIGHWAY 101 over NORTH 1ST STR & VTA LRT
Structure number:37 0116
Location:04-SCL-101-39.29-SJS
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:71.9 ft. [21.9 m]
Total length:213.9 ft. [65.2 m]
Roadway width between curbs:159.1 ft. [48.5 m]
Deck width edge-to-edge:161.8 ft. [49.3 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:43°
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:160,000 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.9 tons [31.7 metric tons]
Inventory rating:20.9 tons [19.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$5,466,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:151,700 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.9 tons [31.7 metric tons]
Inventory rating:20.9 tons [19.0 metric tons]
Sufficiency rating:66.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$5,715,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:169,900 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,732,000