| Name: | SB INTERSTATE 280 over 7TH STREET, ON-RAMP |
| Structure number: | 37 0280L |
| Location: | 04-SCL-280-R1.55-SJS |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 138.5 ft. [42.2 m] |
| Total length: | 607.0 ft. [185.0 m] |
| Roadway width between curbs: | 65.9 ft. [20.1 m] |
| Deck width edge-to-edge: | 67.9 ft. [20.7 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Skew angle: | 24° |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 5 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 105,200 [as of 1998] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 90.9 tons [82.6 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 76.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $4,084,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 106,900 [as of 1997] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 90.8 tons [82.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,386,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 88,550 [as of 1990] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 90.1 tons [81.9 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |