Facts 

Name:SB INTERSTATE 280 over 7TH STREET, ON-RAMP
Structure number:37 0280L
Location:04-SCL-280-R1.55-SJS
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:138.5 ft. [42.2 m]
Total length:607.0 ft. [185.0 m]
Roadway width between curbs:65.9 ft. [20.1 m]
Deck width edge-to-edge:67.9 ft. [20.7 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:24°
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:105,200 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.9 tons [82.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:76.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,084,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:106,900 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.8 tons [82.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,386,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:88,550 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.1 tons [81.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]