STATE ROUTE 87 over GUADALUPE RIVER & ROADS
Map
Coordinates:
+37.33083, -121.8963937°19'51" N, 121°53'47" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | STATE ROUTE 87 over GUADALUPE RIVER & ROADS |
| Structure number: | 37 0308 |
| Location: | 04-SCL-087-5.67-SJS |
| Purpose: | Carries highway over highway and waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 154.9 ft. [47.2 m] |
| Total length: | 1018.1 ft. [310.3 m] |
| Roadway width between curbs: | 98.8 ft. [30.1 m] |
| Deck width edge-to-edge: | 104.7 ft. [31.9 m] |
| Vertical clearance below bridge: | 17.7 ft. [5.4 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1978 |
| Year reconstructed: | 1988 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 7 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 78,000 [as of 1999] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 59.5 tons [54.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 81.8 |
2000 Inspection
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,500 [as of 1990] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 95.9 |