Share:

BLOSSOM HILL ROAD over ROUTE 82 (MONTEREY HWY)

Map 

Coordinates:
+37.25556, -121.80167
37°15'20" N, 121°48'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BLOSSOM HILL ROAD over ROUTE 82 (MONTEREY HWY)
Structure number:37 0345
Location:04-SCL-082-R.35-SJS
Purpose:Carries highway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:148.3 ft. [45.2 m]
Total length:352.7 ft. [107.5 m]
Roadway width between curbs:96.1 ft. [29.3 m]
Deck width edge-to-edge:102.4 ft. [31.2 m]
Vertical clearance below bridge:22.0 ft. [6.7 m]
Skew angle:10°
Owner:City or Municipal Highway Agency [04]
Year built:1974
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:12
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,247 [as of 1999]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:65.6 tons [59.6 metric tons]
Sufficiency rating:76.5
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]

2000 Inspection 

Status:Open, no restriction [A]
Truck traffic:1% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:65.3 tons [59.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:88.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$8,153,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:94.1 tons [85.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0