Facts 

Name:STATE ROUTE 85 over CALABAZAS CREEK
Structure number:37 0527R
Location:04-SCL-085-R15.4-SJS
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:78.1 ft. [23.8 m]
Total length:155.8 ft. [47.5 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:59.4 ft. [18.1 m]
Skew angle:69°
Owner:State Highway Agency [01]
Year built:1993
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:54,000 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:76.6 tons [69.6 metric tons]
Inventory rating:50.6 tons [46.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,448,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:47,950 [as of 1997]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:83.0