Facts 

Name:INTERSTATE 880 over COYOTE CREEK & BROKAW RD
Structure number:37 0636
Location:04-SCL-880-5.34-SJS
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:157.5 ft. [48.0 m]
Total length:544.6 ft. [166.0 m]
Roadway width between curbs:146.7 ft. [44.7 m]
Deck width edge-to-edge:151.9 ft. [46.3 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

Latest Available Inspection: March 2015 

Status:Open, no restriction [A]
Average daily traffic:140,000 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:59.5 tons [54.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:80.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$12,432,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
March 201580.0Structurally deficientPoorVery GoodGood140000
March 201382.0Structurally deficientPoorVery GoodGood140000
April 201184.0Not deficientFairVery GoodGood129000
April 200984.0Not deficientFairVery GoodGood129000
March 200785.0Not deficientGoodVery GoodGood129000
July 200585.0Not deficientGoodVery GoodGood129000
March 2001100.0Not deficientGoodVery GoodGood-