BRANHAM LN over GUADALUPE RIVER
Map
Coordinates:
+37.26333, -121.8755637°15'48" N, 121°52'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | BRANHAM LN over GUADALUPE RIVER |
| Structure number: | 37C0085 |
| Location: | NEAR ALMADEN EXPWY |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 33.1 ft. [10.1 m] |
| Total length: | 131.9 ft. [40.2 m] |
| Roadway width between curbs: | 101.1 ft. [30.8 m] |
| Deck width edge-to-edge: | 124.3 ft. [37.9 m] |
| Skew angle: | 3° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1975 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 31,900 [as of 2005] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 66.3 tons [60.3 metric tons] |
| Inventory rating: | 39.9 tons [36.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 81.8 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,890 [as of 1998] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 65.8 tons [59.8 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Sufficiency rating: | 85.7 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,890 [as of 1990] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 65.3 tons [59.4 metric tons] |
| Inventory rating: | 38.6 tons [35.1 metric tons] |
| Sufficiency rating: | 87.0 |