Share:

ALMADEN EXPWY over GUADALUPE RIVER

Map 

Coordinates:
+37.28833, -121.88167
37°17'18" N, 121°52'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ALMADEN EXPWY over GUADALUPE RIVER
Structure number:37C0101
Location:JUST S/O OLD ALMADEN RD
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:57.1 ft. [17.4 m]
Total length:173.9 ft. [53.0 m]
Roadway width between curbs:43.0 ft. [13.1 m]
Deck width edge-to-edge:51.8 ft. [15.8 m]
Skew angle:53°
Owner:County Highway Agency [02]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:40,840 [as of 2004]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:88.9

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,010 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:95.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,010 [as of 1986]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.3