ALMADEN EXPWY over GUADALUPE RIVER
Map
Coordinates:
+37.28833, -121.8816737°17'18" N, 121°52'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ALMADEN EXPWY over GUADALUPE RIVER |
| Structure number: | 37C0101 |
| Location: | JUST S/O OLD ALMADEN RD |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 57.1 ft. [17.4 m] |
| Total length: | 173.9 ft. [53.0 m] |
| Roadway width between curbs: | 43.0 ft. [13.1 m] |
| Deck width edge-to-edge: | 51.8 ft. [15.8 m] |
| Skew angle: | 53° |
| Owner: | County Highway Agency [02] |
| Year built: | 1961 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 40,840 [as of 2004] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 88.9 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,010 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 95.9 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,010 [as of 1986] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 96.3 |