CANYON RD over OUTSIDE CANAL
Map
Coordinates:
+37.03778, -120.9088937°02'16" N, 120°54'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CANYON RD over OUTSIDE CANAL |
| Structure number: | 39C0196 |
| Location: | 0.3 MI S PIONEER RD |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Collector (Rural) [08] |
| Length of largest span: | 27.9 ft. [8.5 m] |
| Total length: | 100.1 ft. [30.5 m] |
| Roadway width between curbs: | 32.5 ft. [9.9 m] |
| Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1965 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 477 [as of 2008] |
| Truck traffic: | 43% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 53.1 tons [48.3 metric tons] |
| Inventory rating: | 32.1 tons [29.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 68.8 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $509,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 460 [as of 1998] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 44.9 tons [40.8 metric tons] |
| Inventory rating: | 27.0 tons [24.5 metric tons] |
| Sufficiency rating: | 89.5 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 460 [as of 1990] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 40.8 tons [37.1 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Sufficiency rating: | 93.9 |