CANYON RD over OUTSIDE CANAL

Map 

Coordinates:
+37.03778, -120.90889
37°02'16" N, 120°54'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CANYON RD over OUTSIDE CANAL
Structure number:39C0196
Location:0.3 MI S PIONEER RD
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:27.9 ft. [8.5 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:32.5 ft. [9.9 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Owner:County Highway Agency [02]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:477 [as of 2008]
Truck traffic:43% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:53.1 tons [48.3 metric tons]
Inventory rating:32.1 tons [29.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:68.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$509,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:460 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:89.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:460 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:40.8 tons [37.1 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:93.9