Share:

TUOLUMNE STREET over STATE ROUTE 99

Map 

Coordinates:
+36.73278, -119.80139
36°43'58" N, 119°48'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TUOLUMNE STREET over STATE ROUTE 99
Structure number:42 0171
Location:06-FRE-099-20.92-FRE
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:78.7 ft. [24.0 m]
Total length:157.8 ft. [48.1 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,650 [as of 2003]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:51.8 tons [47.1 metric tons]
Sufficiency rating:76.2
Recommended work:Other structural work, including hydraulic replacements. [38]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,577 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:51.8 tons [47.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.3
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,432,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,577 [as of 1976]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:51.5 tons [46.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$577,000