TUOLUMNE STREET over STATE ROUTE 99
Map
Coordinates:
+36.73278, -119.8013936°43'58" N, 119°48'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | TUOLUMNE STREET over STATE ROUTE 99 |
| Structure number: | 42 0171 |
| Location: | 06-FRE-099-20.92-FRE |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 78.7 ft. [24.0 m] |
| Total length: | 157.8 ft. [48.1 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 54.1 ft. [16.5 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1957 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 6,650 [as of 2003] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.8 tons [78.0 metric tons] |
| Inventory rating: | 51.8 tons [47.1 metric tons] |
| Sufficiency rating: | 76.2 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,577 [as of 1998] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.8 tons [78.0 metric tons] |
| Inventory rating: | 51.8 tons [47.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 76.3 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,432,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,577 [as of 1976] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 85.1 tons [77.4 metric tons] |
| Inventory rating: | 51.5 tons [46.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 76.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $577,000 |