STATE ROUTE 41 over HERNDON CANAL
Map
Coordinates:
+36.77944, -119.7847236°46'46" N, 119°47'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | STATE ROUTE 41 over HERNDON CANAL |
| Structure number: | 42 0383 |
| Location: | 06-FRE-041-R26.44-FRE |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 13.1 ft. [4.0 m] |
| Total length: | 40.0 ft. [12.2 m] |
| Roadway width between curbs: | 180.1 ft. [54.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1980 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Culvert [19] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 114,900 [as of 1997] |
| Truck traffic: | 6% of total traffic |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Culvert condition: | No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 85.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 114,900 [as of 1997] |
| Truck traffic: | 6% of total traffic |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Culvert condition: | No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 85.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 99,000 [as of 1990] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Culvert condition: | No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 70.0 |