S GOLDEN STATE BLV over BNSF RY & NORTH AVE
Map
Coordinates:
+36.69222, -119.7500036°41'32" N, 119°45'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | S GOLDEN STATE BLV over BNSF RY & NORTH AVE |
| Structure number: | 42C0084 |
| Location: | 06-FRE-383-0-FRE |
| Purpose: | Carries highway and pedestrian walkway over highway and railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 158.1 ft. [48.2 m] |
| Total length: | 1278.9 ft. [389.8 m] |
| Roadway width between curbs: | 44.0 ft. [13.4 m] |
| Deck width edge-to-edge: | 52.8 ft. [16.1 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 99° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1936 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Steel [3] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,000 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 71.0 tons [64.5 metric tons] |
| Inventory rating: | 42.8 tons [38.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 63.2 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $10,516,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,000 [as of 2000] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 25.3 tons [23.0 metric tons] |
| Inventory rating: | 14.3 tons [13.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 32.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $7,531,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,000 [as of 1988] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 13.9 tons [12.6 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 3.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $15,570,000 |