TUOLUMNE STREET over UP RR, G STREET & H ST

Map 

Coordinates:
+36.73583, -119.79778
36°44'09" N, 119°47'52" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TUOLUMNE STREET over UP RR, G STREET & H ST
Structure number:42C0593
Location:SOUTHWEST OF BROADWAY
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:89.9 ft. [27.4 m]
Total length:1053.2 ft. [321.0 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:36.7 ft. [11.2 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,259 [as of 1976]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.7 tons [51.5 metric tons]
Inventory rating:34.2 tons [31.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$5,735,000

2000 Inspection 

Average daily traffic:9,200 [as of 1998]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,259 [as of 1976]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.4 tons [51.3 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,622,000