Share:

STATE ROUTE 60 over EUCLID AVE

Map 

Coordinates:
+34.03000, -118.20500
34°01'48" N, 118°12'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:STATE ROUTE 60 over EUCLID AVE
Structure number:53 0069R
Location:07-LA-060-R.94-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:60.0 ft. [18.3 m]
Total length:145.0 ft. [44.2 m]
Roadway width between curbs:64.6 ft. [19.7 m]
Deck width edge-to-edge:66.6 ft. [20.3 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:23°
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:96,150 [as of 2000]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.8 tons [59.8 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,508,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:96,150 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.8 tons [59.8 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,615,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:94,150 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$652,000