Share:

MAIN STREET over ROUTE 1

Map 

Coordinates:
+34.01167, -118.49333
34°00'42" N, 118°29'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MAIN STREET over ROUTE 1
Structure number:53 0316
Location:07-LA-001-35.07-SMCA
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:101.1 ft. [30.8 m]
Total length:149.9 ft. [45.7 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Vertical clearance below bridge:21.3 ft. [6.5 m]
Skew angle:20°
Owner:State Highway Agency [01]
Year built:1926
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,500 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.7 tons [33.4 metric tons]
Inventory rating:22.1 tons [20.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,263,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,500 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:25.0 tons [22.7 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$905,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,500 [as of 1992]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$546,000