Share:

AVENUE 43 over ROUTE 110

Map 

Coordinates:
+34.09333, -118.20333
34°05'36" N, 118°12'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:AVENUE 43 over ROUTE 110
Structure number:53 0427
Location:07-LA-110-27.12-LA
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:68.9 ft. [21.0 m]
Total length:194.9 ft. [59.4 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:39.0 ft. [11.9 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1939
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 2000]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.8 tons [57.1 metric tons]
Inventory rating:36.9 tons [33.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,187,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.8 tons [57.1 metric tons]
Inventory rating:36.9 tons [33.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.7
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,272,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1988]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$513,000