STADIUM WAY over ROUTE 110
Map
Coordinates:
+34.07000, -118.2366734°04'12" N, 118°14'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | STADIUM WAY over ROUTE 110 |
| Structure number: | 53 0540R |
| Location: | 07-LA-110-24.76-LA |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 89.9 ft. [27.4 m] |
| Total length: | 134.8 ft. [41.1 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 32.2 ft. [9.8 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Skew angle: | 15° |
| Owner: | State Highway Agency [01] |
| Year built: | 1942 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 2000] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 89.8 tons [81.6 metric tons] |
| Inventory rating: | 53.9 tons [49.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $505,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 89.8 tons [81.6 metric tons] |
| Inventory rating: | 53.9 tons [49.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $725,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1988] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 89.1 tons [81.0 metric tons] |
| Inventory rating: | 53.5 tons [48.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $294,000 |