Share:

U.S. HIGHWAY 101 over SILVER LAKE BLVD

Map 

Coordinates:
+34.07833, -118.28333
34°04'42" N, 118°16'60" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:U.S. HIGHWAY 101 over SILVER LAKE BLVD
Structure number:53 0613
Location:07-LA-101-3.76-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:83.0 ft. [25.3 m]
Total length:310.1 ft. [94.5 m]
Roadway width between curbs:96.1 ft. [29.3 m]
Deck width edge-to-edge:110.6 ft. [33.7 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:57°
Owner:State Highway Agency [01]
Year built:1948
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:265,000 [as of 2000]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:103.6 tons [94.2 metric tons]
Inventory rating:62.8 tons [57.1 metric tons]
Sufficiency rating:76.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:273,200 [as of 1997]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:62.8 tons [57.1 metric tons]
Sufficiency rating:80.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:262,900 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:62.4 tons [56.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$2,334,000