Share:

SUNSET BLVD over ROUTE 101

Map 

Coordinates:
+34.09833, -118.31333
34°05'54" N, 118°18'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SUNSET BLVD over ROUTE 101
Structure number:53 0677
Location:07-LA-101-6.25-LA
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:91.9 ft. [28.0 m]
Total length:168.0 ft. [51.2 m]
Roadway width between curbs:75.1 ft. [22.9 m]
Deck width edge-to-edge:102.4 ft. [31.2 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:27°
Owner:State Highway Agency [01]
Year built:1951
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,726 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:75.8 tons [68.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,688,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,726 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:75.8 tons [68.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,875,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,726 [as of 1987]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:75.2 tons [68.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,161,000