Share:

6TH ST SB OFF-RAMP over ROUTE 110

Map 

Coordinates:
+34.05167, -118.25833
34°03'06" N, 118°15'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:6TH ST SB OFF-RAMP over ROUTE 110
Structure number:53 0747K
Location:07-LA-110-22.76-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:94.2 ft. [28.7 m]
Total length:200.1 ft. [61.0 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:35.8 ft. [10.9 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:32°
Owner:State Highway Agency [01]
Year built:1953
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,500 [as of 2000]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:76.8 tons [69.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:89.2

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,500 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:76.8 tons [69.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,500 [as of 1978]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:76.2 tons [69.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.0