Share:

ROUTE 110 over 9TH STREET

Map 

Coordinates:
+34.04833, -118.26500
34°02'54" N, 118°15'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ROUTE 110 over 9TH STREET
Structure number:53 0752
Location:07-LA-110-22.27-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:88.9 ft. [27.1 m]
Total length:92.9 ft. [28.3 m]
Roadway width between curbs:158.1 ft. [48.2 m]
Deck width edge-to-edge:177.8 ft. [54.2 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:26°
Owner:State Highway Agency [01]
Year built:1953
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Concrete [1]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:289,000 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Sufficiency rating:79.0
Recommended work:Other structural work, including hydraulic replacements. [38]

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:272,100 [as of 1997]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,761,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:283,800 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,114,000