Share:

RTE 110 COLLECTOR over 8TH STREET ON-RAMP

Map 

Coordinates:
+34.05000, -118.26167
34°02'60" N, 118°15'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RTE 110 COLLECTOR over 8TH STREET ON-RAMP
Structure number:53 0793S
Location:07-LA-110-22.49-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:106.0 ft. [32.3 m]
Total length:113.2 ft. [34.5 m]
Roadway width between curbs:38.4 ft. [11.7 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:47°
Owner:State Highway Agency [01]
Year built:1953
Year reconstructed:1969
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:33,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:63.8 tons [58.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$586,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:33,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.8 tons [58.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$509,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:33,000 [as of 1981]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.4 tons [57.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$324,000