FIGUEROA STREET over ROUTE 110
Map
Coordinates:
+34.03000, -118.2716734°01'48" N, 118°16'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FIGUEROA STREET over ROUTE 110 |
| Structure number: | 53 0891 |
| Location: | 07-LA-110-20.92-LA |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 149.9 ft. [45.7 m] |
| Total length: | 284.1 ft. [86.6 m] |
| Roadway width between curbs: | 128.0 ft. [39.0 m] |
| Deck width edge-to-edge: | 191.0 ft. [58.2 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Skew angle: | 59° |
| Owner: | State Highway Agency [01] |
| Year built: | 1954 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 27,000 [as of 1998] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 94.7 tons [86.1 metric tons] |
| Inventory rating: | 56.9 tons [51.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $8,465,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 94.7 tons [86.1 metric tons] |
| Inventory rating: | 56.9 tons [51.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 94.1 tons [85.5 metric tons] |
| Inventory rating: | 56.4 tons [51.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.0 |