I 110 over EXPOSITION BL,UPRR/LACTC

Map 

Coordinates:
+34.01833, -118.27833
34°01'06" N, 118°16'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 110 over EXPOSITION BL,UPRR/LACTC
Structure number:53 0898
Location:07-LA-110-20-LA
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:49.9 ft. [15.2 m]
Total length:172.9 ft. [52.7 m]
Roadway width between curbs:187.3 ft. [57.1 m]
Deck width edge-to-edge:240.8 ft. [73.4 m]
Vertical clearance below bridge:18.7 ft. [5.7 m]
Skew angle:26°
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:289,000 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,274,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:244,600 [as of 1997]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Sufficiency rating:74.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$6,963,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:248,500 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:72.3 tons [65.7 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,416,000