Share:

I 110 over SR 91

Map 

Coordinates:
+33.87333, -118.28333
33°52'24" N, 118°16'60" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I 110 over SR 91
Structure number:53 0958
Location:07-LA-110-9.85-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:81.0 ft. [24.7 m]
Total length:215.9 ft. [65.8 m]
Roadway width between curbs:221.5 ft. [67.5 m]
Deck width edge-to-edge:237.9 ft. [72.5 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:273,760 [as of 2005]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$8,013,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:195,000 [as of 1997]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.9 tons [32.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$8,587,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:221,000 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,469,000