GLENDALE BLVD over I 5

Map 

Coordinates:
+34.11167, -118.26333
34°06'42" N, 118°15'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GLENDALE BLVD over I 5
Structure number:53 1068
Location:07-LA-005-23.66-LA
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:148.0 ft. [45.1 m]
Total length:369.1 ft. [112.5 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:67.9 ft. [20.7 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:62°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:108.5 tons [98.6 metric tons]
Inventory rating:65.8 tons [59.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,916,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:65.8 tons [59.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,192,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1991]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:65.3 tons [59.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,693,000