LOS FELIZ BL-N5 ON over ROUTE 5
Map
Coordinates:
+34.11833, -118.2683334°07'06" N, 118°16'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LOS FELIZ BL-N5 ON over ROUTE 5 |
| Structure number: | 53 1096S |
| Location: | 07-LA-005-24.21-LA |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 86.9 ft. [26.5 m] |
| Total length: | 282.2 ft. [86.0 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 31.5 ft. [9.6 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1956 |
| Year reconstructed: | 1992 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,800 [as of 1998] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 97.0 tons [88.2 metric tons] |
| Inventory rating: | 58.9 tons [53.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.1 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,386,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,800 [as of 1998] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 96.7 tons [87.9 metric tons] |
| Inventory rating: | 58.9 tons [53.5 metric tons] |
| Sufficiency rating: | 75.2 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,486,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,700 [as of 1986] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 96.0 tons [87.3 metric tons] |
| Inventory rating: | 58.4 tons [53.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $598,000 |