Share:

S5-STATE ST OFF RA over W10-S5 CONNECTOR RAMP

Map 

Coordinates:
+34.05500, -118.21333
34°03'18" N, 118°12'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S5-STATE ST OFF RA over W10-S5 CONNECTOR RAMP
Structure number:53 1326K
Location:07-LA-005-18.31-LA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:90.9 ft. [27.7 m]
Total length:235.9 ft. [71.9 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:33.5 ft. [10.2 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:62°
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:105.3 tons [95.7 metric tons]
Inventory rating:63.8 tons [58.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,238,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.8 tons [58.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,320,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 1983]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:63.4 tons [57.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$534,000