Share:

FOURTH ST over ROUTE 1

Map 

Coordinates:
+34.01167, -118.49167
34°00'42" N, 118°29'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FOURTH ST over ROUTE 1
Structure number:53 1592
Location:07-LA-001-R34.89-SMCA
Purpose:Carries highway overpass over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:74.2 ft. [22.6 m]
Total length:152.9 ft. [46.6 m]
Roadway width between curbs:55.1 ft. [16.8 m]
Deck width edge-to-edge:75.1 ft. [22.9 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:109.8 tons [99.8 metric tons]
Inventory rating:52.8 tons [48.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,790,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:52.8 tons [48.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,921,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,000 [as of 1981]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:52.5 tons [47.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$774,000