SR 210 over CROSS CANYON CULVERT
Map
Coordinates:
+34.24000, -118.3000034°14'24" N, 118°17'60" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.
Facts
| Name: | SR 210 over CROSS CANYON CULVERT |
| Structure number: | 53 2359M |
| Location: | 07-LA-210-R13.48-LA |
| Purpose: | Carries highway over waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 7.9 ft. [2.4 m] |
| Total length: | 21.0 ft. [6.4 m] |
| Roadway width between curbs: | 71.9 ft. [21.9 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1975 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Culvert [19] |
| Deck type: | Not applicable [N] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 104,000 [as of 1999] |
| Truck traffic: | 9% of total traffic |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Culvert condition: | No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $3,277,000 |