Share:

BEVERLY-FIRST ST over BEVERLY/GLENDALE SEP

Map 

Coordinates:
+34.06167, -118.25972
34°03'42" N, 118°15'35" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BEVERLY-FIRST ST over BEVERLY/GLENDALE SEP
Structure number:53C0045
Location:AT 2ND STREET
Purpose:Carries highway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:203.1 ft. [61.9 m]
Total length:562.0 ft. [171.3 m]
Roadway width between curbs:44.6 ft. [13.6 m]
Deck width edge-to-edge:50.5 ft. [15.4 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1942
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,102 [as of 2002]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.8 tons [58.0 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.6
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,431,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,400 [as of 1998]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.8 tons [58.0 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:71.1
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,594,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,400 [as of 1984]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:71.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,858,000