RIVERSIDE DR over LA RIV, AVE 19, UP RR

Map 

Coordinates:
+34.08111, -118.22694
34°04'52" N, 118°13'37" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:RIVERSIDE DR over LA RIV, AVE 19, UP RR
Structure number:53C0160
Location:100' W/O SAN FERNANDO RD
Purpose:Carries highway and pedestrian walkway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:236.9 ft. [72.2 m]
Total length:451.1 ft. [137.5 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:57.1 ft. [17.4 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:36°
Owner:City or Municipal Highway Agency [04]
Year built:1939
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2015 

Status:Open, no restriction [A]
Average daily traffic:23,000 [as of 2005]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Equal to present minimum criteria [6]
Underclearances appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Basically intolerable requiring high priority of corrrective action [3]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.4
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$4,025,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201576.4Functionally obsoleteVery GoodGoodGood23000
May 201360.5Structurally deficientPoorFairSatisfactory23000
May 201173.0Structurally deficientPoorSatisfactorySatisfactory23000
March 200975.1Structurally deficientPoorSatisfactorySatisfactory17000
August 200663.0Structurally deficientPoorSatisfactoryFair17000
June 200454.1Functionally obsoleteFairFairSatisfactory17000
October 200356.4Functionally obsoleteFairFairSatisfactory12200
November 200168.4Functionally obsoleteSatisfactoryGoodGood12200
February 199975.9Functionally obsoleteGoodGoodGood12200
February 199875.9Functionally obsoleteGoodSatisfactoryGood12200
August 199475.3Functionally obsoleteVery GoodGoodGood12200
July 199075.3Functionally obsoleteVery GoodGoodGood12200