FIRST ST over L A RIV,UP,AT&SF,MYERS,
Map
Coordinates:
+34.04833, -118.2283334°02'54" N, 118°13'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FIRST ST over L A RIV,UP,AT&SF,MYERS, |
| Structure number: | 53C1166 |
| Location: | 0.5 MI W/O FWY 101 |
| Purpose: | Carries highway and pedestrian walkway over highway, waterway, and railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 148.0 ft. [45.1 m] |
| Total length: | 1327.2 ft. [404.5 m] |
| Roadway width between curbs: | 56.1 ft. [17.1 m] |
| Deck width edge-to-edge: | 70.9 ft. [21.6 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Skew angle: | 9° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1929 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 2 |
| Main spans material: | Concrete [1] |
| Main spans design: | Arch - Deck [11] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,230 [as of 2002] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 58.2 tons [52.9 metric tons] |
| Inventory rating: | 35.0 tons [31.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $14,406,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,700 [as of 1998] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 58.9 tons [53.5 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 93.6 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,700 [as of 1987] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 58.4 tons [53.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 89.3 |