Share:

WAVERLEY DRIVE over HYPERION AVENUE

Map 

Coordinates:
+34.11139, -118.26889
34°06'41" N, 118°16'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WAVERLEY DRIVE over HYPERION AVENUE
Structure number:53C1179
Location:0.15 SW/O FWY 5
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:60.0 ft. [18.3 m]
Total length:65.0 ft. [19.8 m]
Roadway width between curbs:29.5 ft. [9.0 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1927
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 18 / H 20 [4]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1998]
Truck traffic:1% of total traffic
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.7 tons [74.3 metric tons]
Inventory rating:49.8 tons [45.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$431,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1998]
Truck traffic:1% of total traffic
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.7 tons [74.3 metric tons]
Inventory rating:49.8 tons [45.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,100 [as of 1986]
Truck traffic:1% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:81.2 tons [73.8 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.1