SAN PASCUAL AVE BR over ARROYO SECO CHANNEL
Map
Coordinates:
+34.12167, -118.1666734°07'18" N, 118°10'00" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SAN PASCUAL AVE BR over ARROYO SECO CHANNEL |
| Structure number: | 53C1663 |
| Location: | RAMON DR & GOLD PLACE |
| Purpose: | Carries highway over waterway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 65.9 ft. [20.1 m] |
| Total length: | 162.1 ft. [49.4 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 31.8 ft. [9.7 m] |
| Skew angle: | 23° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1939 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,900 [as of 2004] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 59.2 tons [53.8 metric tons] |
| Inventory rating: | 35.3 tons [32.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 76.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $796,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,300 [as of 1998] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 76.8 tons [69.8 metric tons] |
| Inventory rating: | 35.9 tons [32.6 metric tons] |
| Sufficiency rating: | 79.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,300 [as of 1982] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 70.3 tons [63.9 metric tons] |
| Inventory rating: | 33.7 tons [30.6 metric tons] |
| Sufficiency rating: | 79.3 |