Share:

DELL AVENUE over HOWLAND CANAL

Map 

Coordinates:
+33.98361, -118.46583
33°59'01" N, 118°27'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:DELL AVENUE over HOWLAND CANAL
Structure number:53C1690
Location:0.2 MI S VENICE BLVD
Purpose:Carries highway over waterway
Route classification:Local (Urban) [19]
Length of largest span:42.0 ft. [12.8 m]
Total length:44.9 ft. [13.7 m]
Roadway width between curbs:15.1 ft. [4.6 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Owner:City or Municipal Highway Agency [04]
Year built:1907
Historic significance:Bridge is on the National Register of Historic Places [1]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,270 [as of 1984]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:16.1 tons [14.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:49.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$258,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:1,270 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:44.9 tons [40.8 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Sufficiency rating:72.8

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:1,270 [as of 1984]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$165,000